Grace Technologies_FC

Download Free Case Study

Grace-BurnieLes_Oct-01.jpg

Grace-BurnieLes_Oct-02-3.jpg


GracePESDs® Go Beyond Compliance at a Virginia Wastewater Plant

Learn how mounting the Voltage Test Station (VTS) onto its own enclosure allowed for a wastewater plant to go from a 1-hour, two man operation to a 5-minute, one man operation for performing LOTO.

Case Study Includes:

  • New Product Application
  • Safer Access and Cost Savings
  • Risk Mitigation
  • GraceSense HSM Application